Q.1
A feasible solution to the linear programming problem should
Satisfy the problem constraints
Optimise the objective function
Satisfy the problem constraints and non-negativity restrictions
Satisfy the non-negativity restrictions
Q.2
Critical path moves along the activities having total float of
Positive value
Negative value
Zero value
Same value
Q.3
The first method invented for planning projects was
Bar chart method
Milestone chart
Critical path method (CPM)
Programme evaluation and review technique (PERT)
Q.4
F. W. Taylor introduced a system of organisation known as
Line organisation
Functional organisation
Line and staff organisation
Line, staff and functional organisation
Q.5
Standing orders which are statutory are applicable to
All industries
All process industries and thermal power plants
Only major industries
All industries employing more than 100 workers
Q.6
In the Halsey 50-50 plan, the following are rewarded more
Past good workers
Past poor workers
Past average workers
All of the above
Q.7
Gantt charts are used for
Forecasting sales
Production schedule
Scheduling and routing
Linear programming
Q.8
In perpetual inventory control, the material is checked as it reaches its
Minimum value
Maximum value
Average value
Middle value
Q.9
Service time in queuing theory is usually assumed to follow
Normal distribution
Poisson’s distribution
Erlang distribution
Exponential law
Q.10
ABC analysis deals with
Analysis of process chart
Flow of material
Ordering schedule of job
Controlling inventory costs money
Q.11
A-B-C analysis is used in
CPM
PERT
Inventory control
All of these
Q.12
The interchangeability can be achieved by
Standardization
Better process planning
Bonus plan
Better product planning
Q.13
Earliest finish time can be regarded as
Earliest start time + duration of activity
Earliest start time duration of activity
Latest finish time + duration of activity
Latest finish time duration of activity
Q.14
The mathematical technique for finding the best use of limited resources in an optimum manner is known as
Operation research
Linear programming
Network analysis
Break-even analysis
Q.15
Which of the following statement is correct?
A-B-C analysis is based on Pareto's principle
Simulation can be used for inventory control
Economic order quantity formula ignores variations in demand pattern
All of the above
Q.16
A dummy activity
Is artificially introduced
Is represented by a dotted line
Does not require any time
All of the above
Q.17
A milestone chart
Shows the inter dependences of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of the above
Q.18
A-B-C analysis
Is a basic technique of materials management
Is meant for relative inventory control
Does not depend upon the unit cost of the item but on its annual consumption
All of the above
Q.19
A diagram showing the path followed by men and materials while performing a task is known as
String diagram
Flow process chart
Travel chart
Flow diagram
Q.20
The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode
Early finish
Early start
Late start
Late finish
Q.21
Which of the following type of layout is suitable for automobile manufacturing concern?
Product layout
Process layout
Fixed position layout
Combination layout
Q.22
Father of industrial engineering is
Jack Gilbert
Henry Laurence Gantt
Frederick Taylor
Isaac Newton
Q.23
Standard time is equal to
(Normal time) - (allowances)
(Normal time) + (allowances)
Representative time multiplied by rating factor
Normal time taken by an operation
Q.24
Which of the following incentive plans ensures a part of the swing to the worker and rest to the employer?
Emerson efficiency plan
Taylor plan
Halsey premium plan
Gilbert plan
Q.25
Routing is essential in the following type of industry
Assembly industry
Process industry
Job order industry
Mass production industry
Q.26
An optimum project schedule implies
Optimum utilization of men, machines and materials
Lowest possible cost and shortest possible time for project
Timely execution of project
To produce best results under given constraints
Q.27
Choose the wrong statement Time study is used to
Determine overhead expenses
Provide a basis for setting piece prices or incentive wages
Determine standard costs
Determine the capability of an operator to handle the number of machines
Q.28
In manufacturing management, the term 'Dispatching' is used to describe
Dispatch of sales order
Dispatch of factory mail
Dispatch of finished product of the user
Dispatch of work orders through shop floor
Q.29
Queueing theory deals with problems of
Material handling
Reducing the waiting time or idle time
Better utilization of man services
Effective use of machines
Q.30
Time study is used to
Determine standard costs
Determine the number of machines a person may run
Provide a basis for setting piece price or incentive wages
All of the above
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page