Q.1
__________ is the built up covered area of a building measured at floor level of any storey.
  • a) Covered area
  • b) Carpet area
  • c) Total area
  • d) Plinth area
Q.2
____________ is a list or schedule of quantities of all the possible items of work required for construction of any building or structure.
  • a) Quality survey
  • b) Rate list
  • c) Quantity survey
  • d) Rate schedule
Q.3
_________________ area of a building is the area of verandahs, passage, corridors, balconies, porches, etc.
  • a) Floor area
  • b) Horizontal circulation area
  • c) Vertical circulation area
  • d) Verandah area
Q.4
___________ of building is the useful area or liveable area or lettable area. This is the total floor area minus the circulation area, verandahs, corridors, passages, staircase, lifts, entrance hall, etc. minus other non-useable areas.
  • a) Plinth area
  • b) Floor area
  • c) Carpet area
  • d) Circulation area
Q.5
______________ include general office expenses, rents, taxes, supervision and other costs which are indirect expenses and not productive expenses on the job.
  • a) Total costs
  • b) General costs
  • c) Overhead costs
  • d) Contingencies
Q.6
The capacity of doing work by an artesian or skilled labour in the form of quantity of work per day is known as the ______________
  • a) over-turn
  • b) in-turn
  • c) out-turn
  • d) out-come
Q.7
In earthwork per 28.cu m, how many beldars and mzdoors are required per day?
  • a) 15 Beldars and 8 Mazdoors
  • b) 0 Beldars and 14 Mazdoors
  • c) 2 Beldars and 0 Mazdoors
  • d) 5 Beldars and 4 Mazdoors
Q.8
In flooring how many masons, beldars, mazdoors and bhishti per day are required?
  • a) 4 Beldars, 10 Mazdoors, 10 Masons and 8 Bhishti
  • b) 4 Beldars, 3 Mazdoors, 5 Masons and 1 Bhishti
  • c) 9 Beldars, 13 Mazdoors, 5 Masons and 1 Bhishti
  • d) 3 Mazdoors, 5 Masons and 10 Bhishti
Q.9
A bullock cart can carry about _________ load.
  • a) 3 tonne
  • b) 1 tonne
  • c) 5 tonne
  • d) ½ tonne