Q.1
In prestressed concrete structures the primary problem is damaged caused to ____________
Q.2
Prestressed concrete structures showing visible signs of distress in the form of ____________
Q.3
One of the testing equipments used for inspection is?
Q.4
The pachometer is used to locate the ____________
Q.5
Q.6
How many methods of ferro cementing are there?
Q.7
In which beam tension capacity of steel is greater than combined compression capacity of steel and concrete?
Q.8
The chemical heptachlor in anti-termite proofing has concentration by weight of:
Q.9
If the soil is dry, DPC for ground floor consists of the layer of:
Q.10
Rehabilitation of structures may be required due to several reasons. Choose the correct reason.
Q.11
What is the problem of rehabilitation?
Q.12
Maintaining prestressed concrete structures of various types in a fit and serviceable condition is primary function of ____________
Q.13
In a PSC, the tensioning system may be classified into:
Q.14
Which of the below is not a property of ferro cement?
Q.15
Dampness spreads upwards from the ground only.
Q.16
At roof slab level over the DPC, __________ are provided.
Q.17
Which IS code gives details about termite proofing?
Q.18
Leaks in the pitched roof may be caused due to:
Q.19
Which IS codes gives details about elevators?
Q.20
The slope of a ramp should not be more than:
0 h : 0 m : 1 s