Q.1
Pick up the correct statement from the following:
Q.2
Pick up the incorrect statement from the following:
Q.3
Pick up the correct statement from the following:
Q.4
During the construction period, price variation clause in contracts caters to
Q.5
In PERT analysis, the time estimates of activities and probability of their occurrence follow
Q.6
At a work site, statistical quality control of concrete means
Q.7
The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as
Q.8
The independent float affects only
Q.9
PERT technique of network analysis is mainly useful for
Q.10
In India, are prefabricated components costlier than those of traditional cast-in-situ items that the prefabricated components replace?
Q.11
What estimate would you give for the variance in above problem ?
Q.12
The first method invented for planning projects, was
Q.13
Interfering float is the difference between
Q.14
Free float for any activity is defined as the difference between
Q.15
Pick up the correct statement from the following:
Q.16
Pick up the correct statement from the following:
Q.17
Pick up the correct statement from the following:
Q.18
Pick up the incorrect statement from the following:
Q.19
Pick up the PERT event from the following:
Q.20
PERT analysis is based on
Q.21
Pick up the correct statement from the following with regards to C.P.M. network analysis of projects
Q.22
A CPM family includes
Q.23
Mobilization advance up to 10% of the cost of work is given to a contractor
Q.24
Which of the following is not a PERT event?
Q.25
A contractor has two options;(l) : Invest his money in project A or (II) : Invest his money in project B. If he decides to invest in A, for every rupee invested, he is assured of doubling his money in ten years. If he decides to invest in B, he is assured of making his money 1.5 times in 5 years. If the contractor values his money at 10% interest rate, he
Q.26
Free float is mainly used to
Q.27
The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as
Q.28
Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of swing.
Reason R: If the angle of swing is decreased, the cycle time will be decreased.
Q.29
Consider the following statements:
In the critical path method of construction planning, Free Float can be.
1. Greater than Total Float.
2. Greater than Independent Float
3. Equal to Total Float.
4. Less than Independent Float
Q.30
Updating may result in