Q.1
Consider the following operations:
1. Drilling
2. Blasting
3. Mucking
4. Placing steel
5. Placing concrete
The correct sequence of these operations in tunnel construction is
Q.2
The salient feature of functional organization is
Q.3
The time corresponding to minimum total project cost is
Q.4
Residential buildings are treated as
Q.5
Output of a bulldozer is
(i) Increased if drawbar HP of the tractor is increased for a given hauling distance
(ii) Decreased if drawbar HP of the tractor is increased for a given hauling distance
(iii) Increased if the hauling distance is increased for a given drawbar HP of the tractor
(iv) Decreased if the hauling distance is increased for a given drawbar HP of the tractor
Q.6
The critical activity has
Q.7
Pick up the incorrect statement from the following:
Q.8
The three time estimates for the activities of the network shown in the given figure are shown above their arrows. The earliest expected time for the event 4, is
Construction Planning and Management mcq question image
Q.9
The part of a derrick crane include
(i) Mast
(ii) Boom
(iii) Bull wheel
(iv) Jack
which of these statements are correct?
Q.10
For excavating utility trenches with precise control of depth, the excavation equipment used is
Q.11
For which of the following materials, the output of power shovels for a fixed shovel size will be maximum
Q.12
The original cost of an equipment is Rs.10,000. Its salvage value at the end of its total useful life of five years is Rs. 1,000. Its book value at the end of two years of its useful life (as per straight line method of evaluation of depreciation) will be
Q.13
Crash project duration is obtained by summing the
Q.14
Preliminary project report for a road project must contain
Q.15
The process of incorporating changes and rescheduling or replanning is called
Q.16
If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then the following relation holds good
Q.17
The object of technical planning, is
Q.18
Total float for any activity is defined as the difference between
Q.19
Which of the following is a weakness of bar chart?
Q.20
For completion of a project, the critical path of the network represents
Q.21
The most popular type of organization used for Civil Engineering Constructions, is
Q.22
CPM is
Q.23
Military organization is known as
Q.24
Critical path lies along the activities having total float
Q.25
Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?
Q.26
Power stations are generally treated as
Q.27
If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then
Q.28
Mile Stone charts were invented in the year of
Q.29
Which one of the following represents an activity?
Q.30
A machine is purchased for Rs. 10,000,00 and has an estimated life of 10 years. The salvage value at the end of 10 years is Rs. 1,50,000. The book value of the machine at the end of 5 years using general straight line method of evaluation of depreciation is