Q.1
The main principle of an organisation, is
unity of command
cohegency
effective control at all levels
delegation of authority
all the above.
Q.2
What are the four typical phases in a project?
Planning and analysis phase; design phase; building phase; implementation or publishing phase
Planning phase; analysis phase; design phase; building and testing phase
Planning phase; analysis phase; testing phase; implementation phase
Planning and analysis phase; design phase; building and testing phase; implementation or publishing phase
Q.3
Completion of an activity on CPM network diagram, is generally known
Event
Node
Connector
All the above.
Q.4
A CPM family includes
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
CPS (Critical Path Scheduling)
All the above.
Q.5
The estimated time required to perform an activity, is known as
event
dummy
duration
float.
Q.6
If TL is the latest allowable event occurrence time, total activity slack(s), is equal to
LST-EST
LFT-EFT
TL-EFT
all the above.
Q.7
WHAT ARE THE 4 ELEMENTS IN PROJECT MANAGEMENT
PLANNING, LOCATING, ORGANIZING AND MEASURING
PLANNING, ORGANIZING, CONTROLLING AND MEASURING
PLANNING, ORGANIZING, OVERSEEING AND ORGANIZING
PLANNING, ORGANIZING, INITIALIZING AND MEASURING
Q.8
HOW MANY PHASES INVOLVES IN PROJECT LIFE CYCLE?
1
2
3
4
Q.9
The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as
event
free float
dummy
constant
Q.10
WHAT IS THE OUTCOME OF A GOOD PROJECT MANAGEMENT
SUCCESSFUL PROJECT
NEGATIVE ISSUE CREATED ON SITE
MISCOMMUNICATION AMONG PROJECT TEAM
WASTE OF RESOURCES
Q.11
Henry Gantt developed Bar charts for planning and scheduling of projects in
1880
1900
1920
1940
Q.12
The performance of a specific task in CPM, is known
Dummy
Event
Activity
Contract.
Q.13
How are project costs calculated?
By adding human resources (staff hours times billing rates), plus the marked-up costs of material resources
By adding up the costs of all materials
By a calculation so complicated only a computer could do it
By multiplying the human resources by the material resources
Q.14
If the total float and duration of an activity are 5 anddays respectively, the particular activity can be
started 5 days later
completed 5 days later
performed at slower rate in 15 days
all the above.
Q.15
Modular co-ordination of construction means proper
planning
designing
execution
all the above.
Q.16
Which of the following is a Process Group?
Monitoring and Controlling
Closing
Initiating
All of above
Q.17
Which of the following is a responsibility of a project manager?
Managing stakeholder expectations
Managing project constraints
Gathering product requirements
All of above
Q.18
Which of the following is a characteristic of a project?
Temporary
Progressively elaborated
Specific result
All of above
Q.19
An Executive Engineer may have powers upto
Rs. 25,000
Rs. 50,000
Rs. 100,000
Rs. 200,000
Q.20
Role of Jabatan Kerja Raya are..i) Provide guidance on construction technology adviceii) Provide technical advice to the government at the state, state and district levels.iii) Examine and test the completed fire prevention system.iv) Ensure clients comply with EIA orders.
i dan ii
i and iii
i and iv
iii and iv
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Report Question
×
What's an issue?
Question is wrong
Answer is wrong