Q.1
The major differences between projects and operations are:
  • Projects are ongoing and operations are short
  • Projects should always be done by engineers and operations may be performed by technicians
  • Projects are temporary and operations are ongoing
  • Projects and operations are the same thing but projects always costs more to implement
Q.2
The Overall in-charge of an organisation at the site responsible for the execution of the works, is
  • Executive Engineer
  • Engineer
  • Junior Engineer
  • Sub overseer
Q.3
The time which results in the leasi, possible construction cost of an activity, is known
  • normal time
  • slow time
  • crash time
  • standard time.
Q.4
Site order book is used for recording
  • instructions by the executive engineers
  • construction measurements
  • issue of store equipments
  • names of the casual labour.
Q.5
Construction team means
  • an engineer
  • an architect
  • an owner
  • a contractor
  • all the above.
Q.6
Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following:
  • 1. Pouring of Concrete 2. Erection of form work 3. Curing of concrete 4. Removal of form work
  • 1. Erection of form work 2. Pouring of concrete 3. Curing of concrete 4. Removal of form work
  • 1. Removal of form work 2. Erection of form work 3. Pouring of concrete 4. Curing of concrete
  • 1. Pouring of concrete 2. Curing of concrete 3. Erection of form work 4. Removal of form work
Q.7
Critical path method
  • is an improvement upon bar chart method
  • provides a realistic approach to daily problems
  • avoids delays which are very common in bar charts
  • was invented by Morgan R. Walker of Dupot and James E. Kalley or Remington U.S. in 1957
  • All the above.
Q.8
The salient feature of functional organisation is
  • strict adherence to specifications
  • separation of planning and design part
  • each individual maintains functional efficiency
  • work is properly planned and distributed
  • E. all the above.
Q.9
The most popular type of organisation used for Civil Engineering Constructions, is
  • line organisation
  • line and staff organisation
  • functional organisation
  • effective organisation.
Q.10
The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as
  • duration
  • total flat
  • free float
  • interfering float.
Q.11
Military organisation is known as
  • line organisation
  • line and staff organisation
  • functional organisation
  • none of these.
Q.12
Critical Path Net Work helps an engineer
  • to concentrate his attention on critical activities
  • to divert the resources from non-critical advanced activities to critical activities
  • to be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
  • all the above.
Q.13
Pick up the PERT event from the following:
  • Digging of foundation started
  • Digging of foundation completed
  • Laying of concrete started
  • Laying of concrete completed
  • All the above.
Q.14
If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then the following relation holds good
  • EF = ES + D
  • LS = LF - D
  • LF = LS + D
  • D = EF - ES
  • all the above.
Q.15
Final technical authority of a project lies with
  • Assistant Engineer
  • Executive Engineer
  • Superintending Engineer
  • Chief Engineer.
Q.16
The technique for establishing and maintaining priorities among the various jobs of a project, is known
  • Event flow scheduling technique
  • Critical ratio scheduling
  • Slotting technique for scheduling
  • Short interval scheduling.
Q.17
During which phase of a project is the project plan most closely monitored?
  • Design phase
  • Planning and analysis phase
  • Implementation or publishing phase
  • Building and testing phase
Q.18
Characteristic of construction management are ....i) Complex and it involves a number of individuals from different departments. ii) Unique and cannot be replicated.iii) Consists of a number of associated activities iv) Satisfy the owners requirement and expectations from the project.
  • i and ii
  • i and iii
  • ii, iii and iv
  • i, ii, iii and iv
Q.19
Local authorities during construction are....i) Tenaga Nasional Berhadii) Telekom Malaysiaiii) Jabatan Bomba & Penyelamativ) Indah Water Konsortium
  • ii, iii dan iv
  • i and iii
  • i and iv
  • i, ii, iii and iv
Q.20
Parties involved during the construction except
  • Supplier
  • Authorities
  • FInancial company
  • Jabatan Kerja Raya