Q.1
Pick up the correct statement from the following:
Q.2
Pick up the incorrect statement from the following:
Q.3
Brick walls are measured in sq. m if the thickness of the wall is
Q.4
The item of steel work which is measured in sq.m, is
Q.5
The item of the brick structure measured in sq.m, is
Q.6
The height of the sink of wash basin above floor level is kept
Q.7
The unit of measurement is per quintal for the following:
Q.8
The weight of an item is measured correct to nearest
Q.9
The expected out turn of 2.5 cm cement concrete floor per mansion per day
Q.10
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
Q.11
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
Q.12
The measurement is not made in square meters in case of
Q.13
Cost of fittings and their fixing is specified for the following sanitary fittings
Q.14
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is
Q.15
The most reliable estimate is
Q.16
The brick work is measured in sq metre, in case of
Q.17
According to Indian Standards Institute, the actual size of modular bricks is
Q.18
The brick work is not measured in cu m in case of
Q.19
The 'centre line method' is specially adopted for estimating
Q.20
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
Q.21
The plinth area of a building not includes
Q.22
In the mid-section formula
Q.23
Carpet area does not include the area of
Q.24
While estimating the qualities for the construction of a building, the correct metric unit is
Q.25
The volume is measured correct to the nearest
Q.26
The main factor to be considered while preparing a detailed estimate, is
Q.27
The order of booking dimensions is
Q.28
Berms are provided in canals if these are
Q.29
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
Q.30
According to ISI method of measurement, the order of the sequence is