Q.1
Pick up the correct statement from the following:
Bricks are paid per thousand
Cement is paid per 50 kg bag
Lime is paid per quintal
All the above
Q.2
Pick up the incorrect statement from the following:
Dimensions are measured to the nearest 0.01 m
Areas are measured to the nearest 0.01 sq.m
Cubic contents are measured to the nearest 0.1 cum
Weights are measured to the nearest 0.001 tonnes
Q.3
Brick walls are measured in sq. m if the thickness of the wall is
10 cm
15 cm
20 cm
None of these
Q.4
The item of steel work which is measured in sq.m, is
Collapsible gates
Rolling shutters
Ventilators and glazing
All the above
Q.5
The item of the brick structure measured in sq.m, is
Reinforced brick work
Broken glass coping
Brick edging
Brick work in arches
Q.6
The height of the sink of wash basin above floor level is kept
60 cm
70 cm
75 cm to 80 cm
80 cm
Q.7
The unit of measurement is per quintal for the following:
Collapsible gates with rails
Rolling shutters
Expanded metal wire netting
M.S. reinforcement of R.C.C. works
Q.8
The weight of an item is measured correct to nearest
0.25 kg
0.50 kg
0.75 kg
1.00 kg
Q.9
The expected out turn of 2.5 cm cement concrete floor per mansion per day
2.5 sqm
5.0 sqm
7.5 sqm
10 sqm
Q.10
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
0.200 m³
0.247 m³
0.274 m³
0.295 m³
Q.11
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
0.90 m³
0.94 m³
0.98 m³
1.00 m³
Q.12
The measurement is not made in square meters in case of
D.P.C. (Damp proof course)
Form works
Concrete Jeffries
R.C. Chhajja
Q.13
Cost of fittings and their fixing is specified for the following sanitary fittings
Water closets
Flushing pipes
Lavatory basins
All the above
Q.14
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is
30 D
39 D
50 D
59 D
Q.15
The most reliable estimate is
Detailed estimate
Preliminary estimate
Plinth area estimate
Cube rate estimate
Q.16
The brick work is measured in sq metre, in case of
Honey comb brick work
Brick flat soling
Half brick walls or the partition
All the above
Q.17
According to Indian Standards Institute, the actual size of modular bricks is
23 cm × 11.5 cm × 7.5 cm
25 cm × 13 cm × 7.5 cm
19 cm × 9 cm × 9 cm
20 cm × 10 cm × 10 cm
Q.18
The brick work is not measured in cu m in case of
One or more than one brick wall
Brick work in arches
Reinforced brick work
Half brick wall
Q.19
The 'centre line method' is specially adopted for estimating
Circular buildings
Hexagonal buildings
Octagonal buildings
All the above
Q.20
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
Breadth of the wall
Half breadth of wall on each side
One fourth breadth of wall on each side
None of these
Q.21
The plinth area of a building not includes
Area of the walls at the floor level
Internal shaft for sanitary installations up to 2 sq m. in area
Lift and wall including landing
Area of cantilevered porch
Q.22
In the mid-section formula
The mean depth is the average of depths of two consecutive sections
The area of mid-sections is calculated by using mean depth
The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
All of the above
Q.23
Carpet area does not include the area of
The walls along with doors and other openings
Bath room and lavatory
Kitchen and pantry
None of the above
Q.24
While estimating the qualities for the construction of a building, the correct metric unit is
Meter for length
Cubic metre for area
Square meters for volume
Liter for capacity
Q.25
The volume is measured correct to the nearest
0.01 cum
0.02 cum
0.03 cum
0.04 cum
Q.26
The main factor to be considered while preparing a detailed estimate, is
Quantity of the materials
Availability of materials
Transportation of materials
All the above
Q.27
The order of booking dimensions is
Length, breadth, height
Breadth, length, height
Height, breadth, length
None of these
Q.28
Berms are provided in canals if these are
Fully in excavation
Partly in excavation and partly in embankment
Fully in embankment
All the above
Q.29
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar
In thin slabs, 12 mm minimum or diameter of the bar whichever is more
For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more
All the above
Q.30
According to ISI method of measurement, the order of the sequence is
Length, breadth, height
Breadth, length, height
Height, length, breadth
None of these
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page