Q.1
The rate of an item of work depends on
Q.2
The cross-sections for a highway is taken at
Q.3
The inspection pit or chamber is a manhole provided in a base drainage system
Q.4
Anti-siphonage pipe is connected to
Q.5
The area is measured correct to the nearest
Q.6
While preparing a detailed estimate
Q.7
For the construction of buildings, the subheads of the estimate are
Q.8
The damp proof course (D.P.C.) is measured in
Q.9
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
Q.10
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
Q.11
The concrete work for the following part of the building of specified thickness is measured in square meters
Q.12
The measurement is made in square metre in case of
Q.13
The measurement is made for stone work in square metre in case of
Q.14
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is
Q.15
The detention period in a septic tank is assumed
Q.16
The rate of payment is made for 100 cu m (per % cu m) in case of
Q.17
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
Q.18
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
Q.19
The expected out turn of half brick partition wall per mason per day is
Q.20
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
Q.21
Pick up the correct statement in case of water supply.
Q.22
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
Q.23
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is
Estimating and Costing mcq question image
Q.24
Referring of given figure, pick up the correct statement from the following:
Estimating and Costing mcq question image
Q.25
Size, capacity and materials need be specified for
Q.26
The expected out turn of 12 mm plastering with cement mortar is
Q.27
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
Q.28
The cross-sectional area of the embankment of a canal fully in embankment in the given figure is
Estimating and Costing mcq question image
Q.29
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
Q.30
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is
Estimating and Costing mcq question image
0 h : 0 m : 1 s