The assumption on which the trapezoidal formula for volumes is based, is
The volume is measured correct to the nearest
Brick walls are measured in sq. m if the thickness of the wall is
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
Pick up the incorrect statement from the following:
The height of the sink of wash basin above floor level is kept
The damp proof course (D.P.C.) is measured in
The item of the brick structure measured in sq.m, is
The cross-sections for a highway is taken at
Pick up the correct statement from the following:
The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is
If tensile stress of a steel rod of diameter D iskg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is
While preparing a detailed estimate
The inspection pit or chamber is a manhole provided in a base drainage system
The detention period in a septic tank is assumed
Pick up the item whose weight is added to the weight of respective item, is
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
The area of the cross-section of a road fully in banking shown in the given figure, is
The reduced levels of points,metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the roadinthe chainage of the point with no filling or cutting is
Pick up the excavation where measurements are made in square metres for payment.
The expected out turn of 2.5 cm cement concrete floor per manson per day
A portion of an embankment having a uniform up-gradient 1 inis circular with radiusm of the centre line. It subtendsat the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:the earth work involved.
The order of booking dimensions is
According to Indian Standards Institute, the actual size of modular bricks is
The rate of payment is made forcu m (per % cu m) in case of
The brick work is not measured in cu m in case of
Carpet area does not include the area of