Q.1
The correct statements about engineering.
Solutions meet a want or need.
Solutions come in different forms because they help solve problems.
Solutions are the technology all around us.
All of above
Q.2
This variable in an experiment is the one being changed by the scientist.
dependent (responding) variable
independent (manipulated) variable
observations
control group
Q.3
Which of the following is a disadvantage of the pit method of underpinning?
Simplicity of the engineering
Having moderate deformation of the structure
Low cost of labor to produce result
None of the above
Q.4
This underpinning method strengthens an existing structure's foundation by digging boxes by hand underneath and sequentially pouring concrete in astrategic order. What type of underpinning is this?
Beam and base underpinning
Traditional underpinning
Pile underpinning
Micro-pile underpinning
Q.5
Mini-piled underpinning is generally used when the loads from the foundations need to be transferred to stable soils at considerable depths - usually in excess of 5 meters
True
False
Q.6
The combination of technical and administrative actions to ensure the items and elements of a building in an acceptable standard to perform its required function is known as
Fabrication
Construction
Building maintenance
Renovation
Q.7
Beam design is dependent upon the configuration of the building and the applied loads.
True
False
Q.8
If your lab partner gets chemicals in his/her eyes, the first thing you should do is
Clean up spilled chemical
Call 9-11
Take them to eye wash and tell the teacher immediately
Make the person sit down to calm their nerves
Q.9
Underpinning is the process of strengthening and stabilizing the foundation of an existing building or other structure.
True
False
Q.10
The following are advantages of mass concrete underpinning except
Speed in execution of work
Simplicity of engineering work
Continuous use of building whiles undertaking the work
Low cost of labor
Q.11
Scheduled maintenance is _______ between breakdown maintenance and the preventive maintenance.
Joint
Compromise
Bridge
In
Q.12
As mass increases, KE ...
increases
decreases
stays the same
All of above
Q.13
The following is (are) scheduled maintenance
Overhauling of machine
Cleaning of tank
Whitewashing of building
All of the above
Q.14
A systematic approach for maintenance is
Problem – Cause – Diagnosis – Rectification
Problem– Diagnosis – Cause – Rectification
Problem – Measure – Diagnosis – Rectification
Problem– Diagnosis – Measure – Rectification
Q.15
Belt of an electric motor is broken, it needs
Corrective maintenance
Scheduled maintenance
Preventive maintenance
Timely maintenance
Q.16
With the increase in preventive maintenance cost, breakdown maintenance cost
Increases
Decreases
Remain same
Any of the above
Q.17
In ____ method, the piles are driven along both the sides of existing wall and the needle in the form of pile caps are provided through the existing one.
Miscellaneous method
Vibroflotation
Pit method
Pile method
Q.18
In _____ method of underpinning, the existing wall is divided into suitable sections of width about 1.metre to 1.metre.
Chemical Method
Pile Method
Miscellaneous Method
Pit Method
Q.19
ELECTRICAL CONDUITS should be laid :-
AFTER PLASTERING
AFTER PAINTING COMPLETED
DURING BRICK WORK
NONE
Q.20
The placing of new Foundation below and existing foundation of the process of strengthening the existing Foundation is known as the ___________ of foundation.
Shoring
Underpinning
Grouting
Scaffolding
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Report Question
×
What's an issue?
Question is wrong
Answer is wrong