Q.1
Which of the following is not a component of the shield?
Q.2
Which one of the following statements is not correct for heading and benching method of tunnelling?
Q.3
The method of draining in the tunnels, is generally known as
Q.4
In the wooded bulk-head, used for mucking in steep grade tunnels,
Q.5
High pressure grouting is generally restored for concreting in the lining if the rock strata is:
Q.6
The difference of heights of the tunnels above rail tops of BG and MG tracks is kept
Q.7
For hauling muck from the tunnel, the following type of muck-car is used:
Q.8
In Belgium method of tunnelling
Q.9
The advantages of providing a pair of tunnels as compared to only one large highway tunnel is:
Q.10
Which one of the following methods is adopted for permanent drainage of tunnels?
Q.11
Ribs are used for strengthening and stiffening the liner plate for tunnels of diameter greater than
Q.12
For B.G. single track railway, the height of the tunnel above top of rails should be
Q.13
The following operations are required for tunnelling in rocky terrain:
1.Removing the foul gases
2.Marking the tunnel profile
3.Setting up and drilling
4.Checking misfire
5.Mucking
The correct sequence is:
Q.14
The length of the needle beam used in needle beam method of tunnelling is usually
Q.15
"Consider the following situations.
1.Soil is soft.
2.Volume of existing surface traffic on the alignment is heavy.
3.Track is at a deeper level.
4.Water table is high.
In the construction of Metro Railways, “Cut and Cover” method of construction is suitable in situations listed at "
Q.16
For tunnels exceeding 300 m in length, the grade should be provided below
Q.17
In case of railways,
Q.18
Which one of the following methods of tunnelling does not require the use of time bearing?
Q.19
To attain the required shape of the tunnel section, we use:
Q.20
The most suitable soil for compressed air tunnelling is
Q.21
Which one of the following statements is not correct in respect of setting of an inclined tunnel?
Q.22
Which one of the following methods is generally used for the layout of the muck-car tracks?
Q.23
The concentration of the dust particles of the size 0.5 to 5 microns adjacent to the working face should not be more than
Q.24
For B.G. single track, the section of the tunnel must have a width
Q.25
What is the correct sequence of the following events of construction of a shaft in rock?
1.Drilling and blasting
2.Timbering
3.Pumping
4.Mucking
Select the correct answer using the codes given below Codes:
Q.26
A good blast with a good yield is obtained if the cut hole is
Q.27
Railway tunnels are generally
Q.28
Which one of the following tunneling methods is used for laying underground sewers?
Q.29
In compressed air tunnelling, the volume of free air provided is
Q.30
For full face method, the excavation to be done is generally divided into