Q.1
Data Definition Language (DDL)
Q.2
In phase 1 of the system development life cycle, which of the following aspects are usually analyzed?
Q.3
During the maintenance phase
Q.4
The approach used in top-down analysis and design is
Q.5
Which of the following statements, is (are) not true for the lease option
Q.6
The two classifications of inputs are
Q.7
Which of the following is not a factor in the failure of the systems developments projects?
Q.8
A Ring, refers to a record chain, the last of which refers to the first record, in the chain, is called a/an
Q.9
The primary tool used in structured design is a:
Q.10
Documentation is prepared
Q.11
System Implementation Phase entails
Q.12
Which of the following is not true of the conversion phase of the development life cycle?
Q.13
A problem's _____ will answer the question, "What information will the computer need to know in order to either print or display the output times?"
Q.14
System Study involves
Q.15
The primary tool used in structured design is a:
Q.16
A decision table facilitates conditions to be related to
Q.17
Conversion method in which users, being used to an old system, continue to use the old system, along with the new system, is
Q.18
The person communicating with the manager to identify information needs is the
Q.19
In a _____ one module of the new information system is activates at a time.
Q.20
In Prototyping
Q.21
The step-by-step instructions that solve a problem are called _____.
Q.22
A _____ is an outline of a process that keeps develop successful information systems
Q.23
A branch office, location or other data processing centres, where a newly developed system is used under normal operating conditions for several months, to test it, is called
Q.24
The systems have been classified in different ways
Q.25
Which of the following' is NOT a characteristic of good test data?
Q.26
A structure chart is
Q.27
A turnkey package includes
Q.28
A square symbols
Q.29
An appraisal, of a system's performance after it has been installed, is called system
Q.30
A pseudocode is
Q.31
During system study, data can be collected through
Q.32
Which of the following represents processor activities, methods, and procedures in a data flow diagram?
Q.33
When desk-checking an algorithm, you should set up a table that contains _____.
Q.34
Data dictionary contains detail of
Q.35
Which of the following statements is true
Q.36
A self check digit is useful in detecting
Q.37
Advantages of Relational Database Management systems are
Q.38
Which of the following is not a requirement of structured design?
Q.39
The Data flow diagram (DFD) shows;
Q.40
In data-flow diagrams, an originator or receiver of the data is usually designated by
Q.41
Announcement of MIS implementation is made by
Q.42
A problem's _____ will answer the question, "What does the user want to see either printed or displayed on the screen?"
Q.43
A data flow diagram is
Q.44
A graphic representation of an information system is called
Q.45
The outstanding Invoice file should be stared on a Pardon Access Storage Device if
Q.46
Environment in systems parlance refers to
Q.47
In Decision trees
Q.48
A hierarchical chart that divides a large program into modules, in which greater details is designed in successively lower programming levels, is called a
Q.49
Which of the following is (are) the characteristic(s) of a system?
Q.50
The term Parallel Run refers to
0 h : 0 m : 1 s