Q.1
A data element in a record, that uniquely distinguishes the record, from all other records, is called
Q.2
Which of the following is a function of the process step of data processing?
Q.3
The communication problem involves the
Q.4
The Turnaround is
Q.5
Procedure development occurs within the
Q.6
To which phase of SDLC, is file conversion related?
Q.7
The structure chart is
Q.8
Which of the following affects the extent to which you are involved with the system development life cycle in your company?
Q.9
The reservation system of Indian railways is an example of
Q.10
You record the algorithm in the _____ column of the IPO chart.
Q.11
The instruction "If it's raining outside, then take an umbrella to work" is an example of the _____ structure,
Q.12
At the time of system study, flowcharts are drawn using
Q.13
Which of the following might be output as a result of using a CASE tool?
Q.14
Programmers refer to the items needed to reach a problem's goal as the _____
Q.15
Which of the following is done in order a data in phase 1 of the system development life cycle?
Q.16
System Specifications are used to
Q.17
Which of the following is not an advantage of the structured approach to system development?
Q.18
Benchmarking is used
Q.19
Which of the following statements is not true
Q.20
The recipe instruction "Beat until smooth' is an example of the _____ structure.
Q.21
Which of the following is not a characteristic of structured system development?
Q.22
An audit trial is
Q.23
The first items defined for a new system are its :
Q.24
Which of the following does not occur in phase - 4 of the system development life cycle (SDLC)
Q.25
The procedure for evaluating the relative performance of different computers, is done by the process called
Q.26
Which of the following is not a characteristic of a system?
Q.27
The main purpose of the system investigation phase is to produce
Q.28
The black box concept is based on the assumption(s) that;
Q.29
The model base cannot be prepared until
Q.30
Requirements also serve as an evaluation checklist at the end of the development project, so they are sometimes called _____.
Q.31
A couple:
Q.32
Which of the following statements is true
Q.33
The four icons used in building Data Flow Diagram are
Q.34
Which of the following is not a programming control structure?
Q.35
The systems conversion technique of totally removing the existing system and immediately implementing the new system is called as
Q.36
Structured programming involves
Q.37
What type of software is most useful in financial planning and calculation?
Q.38
Structured design produces computer programs that are:
Q.39
Coding and testing are done In a
Q.40
A common reason for changing an information system is
Q.41
The time lag, between the keying of the last character on the keyboard input and the appearance of the first output character on the screen, is known as
Q.42
Difference between Decision - Tables and Decision Trees is (are):
Q.43
Structured design produces computer programs that are
Q.44
Decision tree uses
Q.45
The term scheme means
Q.46
A channel for communicating across a boundary between two or more sub-systems is known as
Q.47
The first step to the system study project is to
Q.48
The data stored on a tape or disk file may be recorded in a report form described as
Q.49
In Data structure, main characteristic of "ring" is :
Q.50
Which of the following control structures is used in every program?
0 h : 0 m : 1 s