Q.1
Quality management system _________ perception of customers towards company.
  • a) Improves
  • b) Deprove
  • c) Recede
  • d) Worsen
Q.2
Good quality construction _________ the wastage of materials, smooth function of the team.
  • a) Increases
  • b) Decreases
  • c) Doesn’t effect
  • d) Gain
Q.3
Quality control helps to ___________ the risks of overdesign that ___________ the overall cost.
  • a) Maximize, Increase
  • b) Minimize, Increase
  • c) Maximize, Decrease
  • d) Minimize, Decrease
Q.4
It opens the area of improvement for quality construction rationally based on the documents from __________ projects.
  • a) Previous
  • b) Next
  • c) Later
  • d) Future
Q.5
Quality of construction activities will be tracked by quality management documents.
  • a) True
  • b) False
Q.6
It __________ job-site concrete handling, curing, sampling and testing procedures.
  • a) Improves
  • b) Deprove
  • c) Recede
  • d) Worsen
Q.7
Minimize the cost of repair and maintenance of the structure.
  • a) True
  • b) False
Q.8
The concrete mix should be designed in the laboratory with the materials to be used on site.
  • a) True
  • b) False