Q.1
_________ is defined as the main plank which remains in contact with sides of Trench.
  • a) Sheeting
  • b) Wale
  • c) Sheathing
  • d) Bracing
Q.2
Identify the missing data in the below figure.
Questionconstruction-building-materials-questions-answers2.jpg
  • a) Bracing
  • b) Sheeting
  • c) Strut
  • d) Wale
Q.3
Identify the missing data in the below figure.
Questionconstruction-building-materials-questions-answers3.jpg
  • a) Ranger
  • b) Wale
  • c) Sheathing
  • d) Bracing
Q.4
Identify the missing data.
Questionconstruction-building-materials-questions-answers4.jpg
  • a) Wale
  • b) Strut
  • c) Bracing
  • d) Sheeting
Q.5
Identify the given type of Timbering.
Questionconstruction-building-materials-questions-answers5.jpg
  • a) Runner
  • b) Stay bracing
  • c) Box sheeting
  • d) Vertical sheeting
Q.6
Identify the given type of Timbering.
Questionconstruction-building-materials-questions-answers6.jpg
  • a) Sheet piling
  • b) Runner
  • c) Stay bracing
  • d) Vertical sheeting
Q.7
The __________ arrangement of preventing the sleep of earth in foundation trenches is used when the excavation is to be carried out in the moderately firm ground.
  • a) Runner
  • b) Stay bracing
  • c) Vertical sheeting
  • d) Sheet piling
Q.8
The _______ arrangement of preventing the slip of earth in the foundation trenches is adopted when a large area is to be excavated for depth greater thanmeters.
  • a) Sheet piling
  • b) Runner
  • c) Box sheeting
  • d) Stay bracing
Q.9
In _______ arrangement, the vertical sheets are placed nearer or sometimes, touching each other.
  • a) Stay bracing
  • b) Box sheeting
  • c) Vertical sheeting
  • d) Runner
Q.10
The _______ method is similar to box sheeting except that the work is carried out in stages and at each stage, and offset is provided.
  • a) Sheet piling
  • b) Box sheeting
  • c) Stay bracing
  • d) Vertical sheeting