Q.1
In a distribution system, in order to improve power factor, the synchronous capacitors are installed
at the receiving end
at the sending end
either (A) or (B)
none of the above
Q.2
Which of the following is the disadvantage of a synchronous condenser ?
High maintenance cost
Continuous losses in motor
Noise
All of the above
Q.3
A synchronous condenser is virtually which of the following?
Induction motor
Under excited synchronous motor
Over excited synchronous motor
generator
Q.4
Generators for peak load plants are usually designed for maximum efficiency at
25 to 50 percent full load
50 to 75 percent full load
full load
25 percent overload
Q.5
Large capacity generators are invariably
water cooled
natural air cooled
forced air cooled
hydrogen cooled
Q.6
Salvage value of the plant is always
positive
negative
zero
any of the above
Q.7
Which of the following are not repayable after a stipulated period ?
Shares
Fixed deposits
Cash certificates
Bonds
Q.8
For any type of consumer the ideal tariff is
two part tariff
three part tariff
block rate tariff
any of the above
Q.9
Which of the following is not an operating cost ?
Maintenance cost
Fuel cost
Salaries of high officials
Salaries of operating staff
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page