Q.1
The final step in RCRA’s cradle-to-grave concept is ___________
  • a) Disposal
  • b) TSDF
  • c) STDF
  • d) TSFF
Q.2
The unit-specific design is required to __________
  • a) Prevent the release of HW
  • b) Good housekeeping
  • c) Analysis
  • d) Export activities
Q.3
TSDFs has to obtain permission in the form of ___________ permit.
  • a) CERCLA
  • b) SARA
  • c) RCRA
  • d) HPL
Q.4
RCRA permits require facilities to develop emergency plans.
  • a) False
  • b) True
Q.5
Permits are typically granted for a period up to ____ years.
  • a) 7
  • b) 8
  • c) 9
  • d) 10
Q.6
Transporters of hazardous waste does not require RCRA permit.
  • a) True
  • b) False
Q.7
What type of waste does Subtitle D of RCRA regulate?
  • a) Solid hazardous waste
  • b) Chemical hazardous waste
  • c) Non-hazardous solid waste
  • d) D. Radioactive waste
Q.8
Storage of incinerable hazardous waste at the site is ______ months.
  • a) 2
  • b) 4
  • c) 6
  • d) 8
Q.9
External safety audit at an incinerator facility is carried out once in _____ year.
  • a) 1
  • b) 2
  • c) 3
  • d) 4
Q.10
The design of TSDF facilities should follow __________ guidelines.
  • a) CPCB
  • b) PCB
  • c) SPCB
  • d) LPCB
Q.11
Solidification of HW is done at TSDF to reduce ________
  • a) Area
  • b) Volume
  • c) Analysis
  • d) Record keeping