Q.1
The alignment of hill roads is divided into how many stages?
  • a) One
  • b) Two
  • c) Three
  • d) Four
Q.2
The general route for alignment is selected during __________
  • a) Reconnaissance
  • b) Trace cut
  • c) Detailed survey
  • d) Detailed project report
Q.3
The bench marks are fixed during the __________
  • a) Preliminary survey
  • b) Reconnaissance
  • c) Detailed survey
  • d) After detailed project report
Q.4
What is the strip length to be surveyed on the straight alignment?
  • a) 5 m
  • b) 10 m
  • c) 15 m
  • d) 30 m
Q.5
What is the speed limit on the national highway on hill road in Kmph?
  • a) 60
  • b) 50
  • c) 40
  • d) 30
Q.6
What is the minimum right of way distance in exceptional cases?
  • a) 7 m
  • b) 5 m
  • c) 3 m
  • d) 4 m
Q.7
The pavement width for a single lane road on a hill is __________
  • a) 3.5 m
  • b) 3.75 m
  • c) 7.0 m
  • d) 7.5 m
Q.8
The flatter camber may be provided if the road has a longitudinal gradient greater than __________
  • a) 1 in 40
  • b) 1 in 35
  • c) 1 in 30
  • d) 1 in 20
Q.9
The camber for the earth roads should be never less than __________
  • a) 4%
  • b) 3.75%
  • c) 3.5%
  • d) 3.0%
Q.10
What is the stopping sight distance for a speed limit ofKmph?
  • a) 30 m
  • b) 40 m
  • c) 60 m
  • d) 120 m
Q.11
What is the intermediate sight distance for a speed limit ofKmph?
  • a) 120 m
  • b) 60 m
  • c) 40 m
  • d) 30 m
Q.12
What is the maximum super elevation on snow bound area?
  • a) 3.0%
  • b) 5.0%
  • c) 7.0%
  • d) 10.0%
Q.13
The minimum sufficient straight distance between the transitional ends for reverse curves is __________
  • a) 3.0 m
  • b) 5.0 m
  • c) 9.0 m
  • d) 12.0 m
Q.14
The absolute minimum radius of the curve in snow bound area is __________
  • a) 60 m
  • b) 70 m
  • c) 80 m
  • d) 90 m