Q.1
When only a small section of an interior area needs to be revealed the drafter can use a ________ section.
Half
Quarter
Full
Broken out
Q.2
To avoid having to dimension to a hidden feature the drafter can utilize a ________ section.
Whole
Half
Broken out
All of the above
Q.3
The architectural drafter usually begins a set of working drawings by creating the ________ plan first.
Foundation
Floor plan
Elevations
Building section
Q.4
The maximum and minimum sizes of a feature are identified by a ________ tolerance.
Limits
GD&T
Reference
Allowance
Q.5
The architectural and construction industries use the United States National CAD standard (NCS) system on many ________ projects.
Residential
Commercial
Aerospace
Publicly funded
Q.6
In isometric projection, all distances are approximately this percentage of their true size:
120 percent
80 percent
50 percent
20 percent
Q.7
Objects that are symmetric can be shown effectively using this type of section:
Quarter section
Half section
Full section
Symmetric section
Q.8
These types of projectors converge at a vanishing point:
Perspective
Parallel
Orthographic
Oblique
Q.9
These plans, made by the steel fabricator, are assembly drawings for the steel structure:
Welding plans
Assembly plans
Construction plans
Erection plans
Q.10
Circular shapes appear in this fashion when viewed at an angle other than 90 degrees:
Circular
Elliptical
Lengthened
Angular
Q.11
The edges of a cube in isometric projection make angles of this many degrees with each other:
30
60
90
120
Q.12
In order to create an accurate assembly drawing the drafter should create the ________ drawings first.
Detail
Title block
Parts list
Isometric
Q.13
PDM is the acronym for:
Project drawing management
Product drawing manipulation
Product data management
Project data manipulation
Q.14
EDM is the acronym for:
Enterprise data management
Engineering drawing management
Enterprise drawing manipulation
Engineering data manipulation
Q.15
Once a drawing is determined to be complete, the title block is used to document the change from:
A draft to a finished drawing
A finished to a working drawing
An assembly to a finished drawing
A working drawing to a draft
Q.16
An oil refinery relies on which type of drafter to maintain and update the technical piping drawings used for the construction and maintenance of the facility.
Architectural
Civil
Process piping
Electrical
Q.17
An architect often relies on a _________ to complete the set of technical drawings used in the design of an office building.
Technical illustrator
Artist
Drafter
Construction superintendent
Q.18
This type of solid is egg-shaped and can be created by revolving an ellipse around one of its axes:
Ellipsoid
Torus
Cone
Cylinder
Q.19
The distance a screw thread advances axially in one turn is the:
Lead
Pitch
Turn
Crest
Q.20
These are vertical distances above a common datum, reference plane, or point:
Plats
Elevations
Traverse
Profiles
Q.21
The organized and orderly approach to solving problems is known as the:
Engineering process
Design process
Aesthetic process
Functional process
Q.22
One critical issue drafters need to pay close attention to is the ________.
Size of the sheet
Designer's intent
Scale factor
None of the above
Q.23
Welding drawings are a special type of this kind of drawing:
Symbol
Perspective
Assembly
Isometric
Q.24
In this type of concrete, the steel is pre-tensioned before the superimposed load is applied:
Aggregate
Pre-stressed
Reinforced
Preloaded
Q.25
A partial auxiliary view usually shows only features on the _________ of the inclined line and not any projection of other planes.
Hidden lines
Plane
Center lines
None of the above
Q.26
Lines of an isometric drawing that are not parallel to the isometric axes are called this:
Trimetric lines
Non-isometric lines
Multiview lines
Dimetric lines
Q.27
This type of section is limited by a break line:
Removed section
Revolved section
Broken-out section
Half section
Q.28
If designs require changes, they should be documented with:
Development plans
Product proposals
Document reviews
Engineering change orders
Q.29
Isometric drawings are often used by ________ to help illustrate complex designs.
Mechanical engineers
Piping drafters
Aerospace engineers
All of the above
Q.30
When creating a Cutting Plane line with Auto-CAD it is customary to use a ________ to create the line.
Center line
Polyline
Dashed line
Hatch line
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page