Q.1
The probability distribution of activity times in PERT follows following distribution
Normal
Binomial
Beta
Exponential
Q.2
The probability distribution of project completion in PERT follows following distribution
Normal
Binomial
Exponential
Gaussian
Q.3
If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be
2 HA
1.33 HA
1.5 HA
1.15 HA
Q.4
In order to avoid excessive multiplication of facilities, the layout preferred is
Product layout
Process layout
Group layout
Static layout
Q.5
The reasons which are basically responsible for the formation of a queue should be that
The average service rate Hess than the average arrival rate
Output rate is linearly proportional to input
Output rate is constant and the input varies in a random manner
All of the above
Q.6
For ship vessel industry the following layout is best suited
Process layout
Product layout
Fixed position layout
Plant layout
Q.7
Breakeven analysis is a
Short term analysis
Long term analysis
Average of short and long term analysis
Any one of these
Q.8
The deductions for, employees provident fund start
Immediately on joining the service
After 60 days of joining the service
After 100 days of joining the service
After 240 days of joining the service
Q.9
PERT/CPM, techniques can be used for following applications
Once through project
Maintenance jobs
Research and development
All of the above
Q.10
Time study is
The appraisal, in terms of time, of the value of work involving human effort
Machine setting time
Time taken by workers to do a job
Method of fixing time for workers
Q.11
The chart which gives an estimate about the amount of materials handling between various work stations is known as
Flow chart
Process chart
Travel chart
Operation chart
Q.12
One of the basic essentials of an incentive plan is that
A differential piece rate system should exist
Minimum wages should be guaranteed
Provide incentive to group efficiency performance
All standards should be based on time studies
Q.13
Standard time as compared to normal time is
Greater
Smaller
Equal
There is no such correlation
Q.14
The correct sequence of phases in value engineering is
Creative phase, information phase, investigation phase, evaluation phase
Information phase, creative phase, investigation phase, evaluation phase
Investigation phase, information phase, creative phase, evaluation phase
Creative phase, investigation phase, evaluation phase, information phase
Q.15
The bonus increases in proportion to the increase in efficiency. This statement applies to
Halsey plan
Gantt plan
Emerson's efficiency plan
Rowan plan
Q.16
Critical path on PERT/CPM chart is obtained by joining the events having
Maximum slack
Minimum slack
Average slack
No slack
Q.17
Critical path method
Helps in ascertaining time schedules
Makes better and detailed planning possible
Provides a standard method for communicating project plans schedules and to time and cost performance
All of the above
Q.18
The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is known as
Duration
Total float
Free float
Interfering float
Q.19
The standard time for a job is
Total work content
Base time + relaxation time
Total work content + basic time
Total work content + delay contingency allowance
Q.20
Abbreviated work factor data is applied for
Material handling operation
Maintenance operation
Packing and shipping operation
All of these
Q.21
The allowed time for a job equals standard time plus
Policy allowance
Interference allowance
Process allowance
Learning allowance
Q.22
The type of layout used for manufacturing steam turbines, is
Product layout
Process layout
Fixed position layout
Any one of these
Q.23
A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is
0.50
0.66
0.84
0.95
Q.24
The type of organisation preferred for a steel industry, is
Line organisation
Functional organisation
Line and staff organisation
Line, staff and functional organisation
Q.25
Current assets include
Manufacturing plant
Manufacturing plant and equipment
Inventories
Common stock held by the firm
Q.26
Which of the following charts are used for plant layout design?
Operation process chart
Man machine chart
Travel chart
All of these
Q.27
Micro-motion study involves following number of fundamental hand motions
8
12
16
20
Q.28
In ABC control policy, maximum attention is given to
Those items which consume money
Those items which are not readily available
Those × items which are in more demand
Those items which consume more money
Q.29
If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by
AP/C
2AP/C
√(2AP/C)
(AP/C)²
Q.30
Routing prescribes the
Flow of material in the plant
Proper utilization of man power
Proper utilization of machines
Inspection of final product
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page