Q.1
A feasible solution to the linear programming problem should
Q.2
Critical path moves along the activities having total float of
Q.3
The first method invented for planning projects was
Q.4
F. W. Taylor introduced a system of organisation known as
Q.5
Standing orders which are statutory are applicable to
Q.6
In the Halsey 50-50 plan, the following are rewarded more
Q.7
Gantt charts are used for
Q.8
In perpetual inventory control, the material is checked as it reaches its
Q.9
Service time in queuing theory is usually assumed to follow
Q.10
ABC analysis deals with
Q.11
A-B-C analysis is used in
Q.12
The interchangeability can be achieved by
Q.13
Earliest finish time can be regarded as
Q.14
The mathematical technique for finding the best use of limited resources in an optimum manner is known as
Q.15
Which of the following statement is correct?
Q.16
A dummy activity
Q.17
A milestone chart
Q.18
A-B-C analysis
Q.19
A diagram showing the path followed by men and materials while performing a task is known as
Q.20
The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode
Q.21
Which of the following type of layout is suitable for automobile manufacturing concern?
Q.22
Father of industrial engineering is
Q.23
Standard time is equal to
Q.24
Which of the following incentive plans ensures a part of the swing to the worker and rest to the employer?
Q.25
Routing is essential in the following type of industry
Q.26
An optimum project schedule implies
Q.27
Choose the wrong statement Time study is used to
Q.28
In manufacturing management, the term 'Dispatching' is used to describe
Q.29
Queueing theory deals with problems of
Q.30
Time study is used to
0 h : 0 m : 1 s