Q.1
P.M.T.S. (Predetermined Motion Time Systems) include
Q.2
PMTP (predetermined motion time systems) include
Q.3
Work study is done with the help of
Q.4
Frederick W. Taylor introduced a system of working known as
Q.5
For handling materials during manufacture of cement, a _________ is widely used.
Q.6
The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as
Q.7
The break-even point represents
Q.8
Monte Carlo solutions in queuing theory are extremely useful in queuing problems
Q.9
Pick up the incorrect statement from the following. A critical ratio scheduling
Q.10
Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant
Q.11
Pick up the incorrect statement about advantages of work sampling
Q.12
Statistical quality control techniques are based on the theory of
Q.13
A dummy activity in a net work diagram
Q.14
An activity of the project is graphically represented by ________ on the network diagram.
Q.15
Which of the following are the guidelines for the construction of a network diagram?
Q.16
According to Rowan plan of wage incentive system, bonus is paid to a worker
Q.17
In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker
Q.18
The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as
Q.19
Which of the following statement is correct about the network diagram?
Q.20
Valve analysis is particularly of interest when
Q.21
Fixed position layout is also known as
Q.22
Process layout is also known as
Q.23
Product layout is also known as
Q.24
The difference between the time available to do the job and the time required to do the job, is known as
Q.25
In A-B-C analysis, which class of items are generally large in number?
Q.26
The employees provident fund act is applicable to
Q.27
In CPM, the cost slope is determined by
Q.28
Which one of the following chart gives simultaneously information about the progress of work and machine loading?
Q.29
The important file in making a PERT is
Q.30
Which of the following layouts is suited for mass production?