Q.1
Direct expenses include
Factory expenses
Selling expenses
Administrative expenses
None of these
Q.2
Indirect expenses include
Factory expenses
Selling expenses
Administrative expenses
All of these
Q.3
Which of the following organizations is best suited for steel plants
Functional organization
Line organization
Staff organization
Line, staff and functional organizations
Q.4
Basic tool in work study is
Graph paper
Process chart
Planning chart
Stop watch
Q.5
The most suitable incentive plan for the maintenance section of an industry will be
Piece rate system
Group incentive plan
Profit sharing plans
Simplification
Q.6
'O' on a PERT/CPM chart represents
An ordinary event
A significant event representing some milestone
An event to be transferred to other network chart
Dangling event
Q.7
The most popular type of organisation used for Civil Engineering Constructions is
Line organization
Line and staff organization
Functional organization
Effective organization
Q.8
In break even analysis, total cost consists of
Fixed cost + sales revenue
Variable cost + sales revenue
Fixed cost + variable cost
Fixed cost + variable cost + profit
Q.9
In break-even analysis, total cost consists of
Fixed cost
Variable cost
Fixed cost + variable cost
Fixed cost + variable cost + overheads
Q.10
The work study is done by means of
Planning chart
Process chart
Stop watch
Any one of these
Q.11
Actual performance of a task is called
An event
An activity
A duration
None of these
Q.12
The essential condition for the decompression of an activity is that
The project time should change due to decompression
After decompression the time of an activity invariably exceeds its normal time
An activity could be decompressed to the maximum extent of its normal time
None of the above
Q.13
According to MAPI formula, the old machine should be replaced by new one when
(Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum)
CAM < DAM
CAM > DAM
CAM = DAM
There is no such criterion
Q.14
Bar charts are suitable for
Minor works
Major works
Large projects
All of the above
Q.15
The simplex method is the basic method for
Value analysis
Operation research
Linear programming
Model analysis
Q.16
Replacement studies are made on the following basis
Annual cost method
Rate of return method
Total life average method
Any one of the above
Q.17
Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
Halsey plan
Gantt plan
Rowan plan
Emerson's efficiency plan
Q.18
In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives in addition to the guaranteed basic pay/wages, is based on:
A standard rating system
A merit rating system
A job evaluation system
His individual performance
Q.19
String diagram is used when
Team of workers is working at a place
Material handling is to be done
Idle time is to be reduced
All of the above
Q.20
Travel charts are used to
Analyze material handling
Determine inventory control difficulties
Plan material handling procedure and routes
All of the above
Q.21
The product layout
Lowers overall manufacturing time
Requires less space for placing machines
Utilizes machine and labour better
All of these
Q.22
Which one of the following techniques is used for determining allowances in time study?
Acceptance sampling
Linear regression
Performance rating
Work sampling
Q.23
The critical path of a network represents
The minimum time required for completion of project
The maximum time required for completion of project
Maximum cost required for completion of project
Minimum cost required for completion of project
Q.24
Job evaluation is the method of determining the
Relative worth of jobs
Skills required by a worker
Contribution of a worker
Contribution of a job
Q.25
Merit rating is the method of determining the
Relative values of a job
Workers performance on a job
Worth of a machine
Value of overall production
Q.26
Which of the following is independent of sales forecast?
Productivity
Inventory control
Production planning
Production control
Q.27
One time measurement unit (TMU) in method time measurement system equals
0.0001 minute
0.0006 minute
0.006 minute
0.001 minute
Q.28
The main object of scientific layout is
To produce better quality of product
To utilize maximum floor area
To minimize production delays
All of these
Q.29
Which of the following statement is correct?
When slack of an activity is zero, it falls only on critical path.
CPM technique is useful to minimize the direct and indirect expenses.
Critical path of a net work represents the minimum time required for completion of project.
All of the above
Q.30
The most important function of inventory control is
Stock control system
To run the stores effectively
Technical responsibility for the state of materials
All of the above
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page