Q.1
The average time recorded by work study man for an operation is called
Standard time
Normal time
Representative time
None of these
Q.2
In the perpetual inventory control, the material is checked when it reaches its
Minimum value
Maximum value
Average value
Alarming value
Q.3
Basic motion time study gives times for basic motions in ten thousandths of
Second
Minute
Hour
Day
Q.4
The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of
Product layout
Process layout
Fixed position layout
A combination of line and process layout
Q.5
Expediting function consists in keeping a watch on
Operator's activity
Flow of material and in case of trouble locate source of trouble
Minimizing the delays
Making efficient dispatching
Q.6
Merit Rating is the method of determining worth of
A job
An individual employee
A particular division in workshop
Machine
Q.7
Pick up the correct statement about relationship between various floats
Free float = total float
Independent float = total float
Independent float > free float
Independent float < free float
Q.8
The aim of value engineering is to
Find the depreciation value of a machine
Determine the selling price of a product
Minimize the cost without change in quality of the product
All of the above
Q.9
Travel charts provide
An idea of the flow of materials at various stages
A compact estimate of the handling which must be done between various work sections
The information for changes required in rearranging material handling equipment
An approximate estimate of the handling which must be done at a particular station
Q.10
Inventory management consists of
Effective running of stores
State of merchandise methods of storing and maintenance etc.
Stock control system
All of the above
Q.11
Dispatching
Prescribes the sequence of operations to be followed
Determines the programme for the operations
Is concerned with the starting of processes
Regulates the progress of job through various processes
Q.12
Material handling in automobile industry is done by
Overhead crane
Trolley
Belt conveyor
All of the above
Q.13
Time study is carried out
By finding all the significant informations regarding the job, work place and machine tool etc
By breaking up each operation into small elements which are measurable with the help of the measuring device accurately
By observing and recording the time taken by the operator for an operation
All of the above
Q.14
Work study is most useful
Where production activities are involved
In judging the rating of machines
In improving industrial relations
In judging the output of a man and improving it
Q.15
In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches
50%
66.67%
75%
80%
Q.16
String diagram is used
For checking the relative values of various layouts
When a group of workers are working at a place
Where processes require the operator to be moved from one place to another
All of the above
Q.17
Simplex method is the method used for
Value analysis
Network analysis
Linear programming
Queuing theory
Q.18
The main disadvantage of line organisation is
Top level executives have to do excessive work
Structure is rigid
Communication delays occur
All of the above
Q.19
A systematic job improvement sequence will consist of
Motion study
Time study
Job enrichment
All of these
Q.20
In the cost structure of a product, the selling price is determined by the factors such as
Sales turn over
Lowest competitive price
Various elements of the cost
All of the above
Q.21
In micro-motion study, therblig is described by
A symbol
An event
An activity
Standard symbol and colour
Q.22
Work study comprises following main techniques
Method study and work measurement
Method study and time study
Time study and work measurement
Method study and job evaluation
Q.23
The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store
Inflated system
Primary cost method
Current value method
Fixed price method
Q.24
The most important objective behind plant layout is
Overall simplification, safety of integration
Economy in space
Maximum travel time in plant
To provide conveniently located shops
Q.25
In fixed position layout
Total production cost is less
Material movement is less
Capital investment is minimum
All of these
Q.26
The main advantage of line organisation is its
Effective command and control
Defined responsibilities at all levels
Rigid discipline in the organisation
All of the above
Q.27
CPM is
Synthesizing in concepts
Is built of activities oriented programmes
Is used for repetitive works
All of the above
Q.28
Linear programming can be applied successfully to
Chemical industry
Oil industry
Banks
All of these
Q.29
Which of the following wage incentive plan is applied to all workers?
Halsey plan
Gantt plan
Emerson's efficiency plan
Rowan plan
Q.30
CPM is the
Time oriented technique
Event oriented technique
Activity oriented technique
Target oriented technique
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page