Q.1
CPM requires
Single time estimate
Double time estimate
Triple time estimate
None of these
Q.2
CPM stands for
Combined Process Method
Critical Path Method
Common Planning Method
Critical Process Method
Q.3
In which of the following layouts, the lines need to the balanced
Process layout
Product layout
Fixed position layout
Plant layout
Q.4
Inventory control in production, planning and control aims at
Achieving optimization
Ensuring against market fluctuations
Acceptable customer service at low capital investment in inventory
Discounts allowed in bulk purchase
Q.5
The technique of value analysis can be applied to
Complicated items only
Simple items only
Crash programmer items only
Any item
Q.6
The production cost per unit can be reduced by
Producing more with increased inputs
Producing more with the same inputs
Eliminating idle time
Minimizing resource waste
Q.7
Gantt chart is used for
Inventory control
Material handling
Production schedule
Machine repair schedules
Q.8
Routing assists engineers in deciding in advance
The flow of material in the plant
The methods of proper utilization of manpower
The methods of proper utilization of machines
The layout of factory facilities
Q.9
The objective of time study is to determine the time required to complete a job by
Fast worker
Average worker
Slow worker
New entrant
Q.10
The determination of standard time in a complex job system is best done through
Stop watch time study
Analysis of micro-motions
Grouping timing technique
Analysis of standard data system
Q.11
Product layout is best suited where
One type of product is produced
Product is standardized
Product is manufactured in large quantities
All of the above
Q.12
The process layout is best suited where
Specialization exists
Machines are arranged according to sequence of operation
Few number of non-standardized units is to be produced
Mass production is envisaged
Q.13
Military organisation is known as
Line organisation
Line and staff organisation
Functional organisation
All of the above
Q.14
Military type of organisation is known as
Line organisation
Functional organisation
Line and staff organisation
Line, staff and functional organisation
Q.15
The type of organisation preferred for an automobile industry, is
Line organisation
Functional organisation
Line and staff organisation
Line, staff and functional organisation
Q.16
At the break-even point,
Total cost is more than the sales revenue
Total cost is less than the sales revenue
Total cost is equal to sales revenue
Fixed cost is equal to variable cost
Q.17
Process layout is employed
Where low volume of production is required
Where similar jobs are manufactured on similar machines
Where machines are arranged on functional basis
All of the above
Q.18
Product layout is used for
Job production
Batch production
Mass production
Any one of these
Q.19
The unit cost in case of batch production is __________as compared to jobbing production.
Same
Low
High
None of these
Q.20
Which of the following statement is wrong?
An activity consumes time and resources whereas an event does not consume time or resources
The performance of a specific task is called an activity
An event is an instantaneous point in time at which an activity begins or ends
The turning of a job on lathe is an event whereas job turned is an activity
Q.21
Which of the following are the principles of material handling?
Keep all the handling to the minimum
Select only efficient handling equipment
Move the heaviest weight to the least distance
All of the above
Q.22
Templates are used for
A planning layout
Flow of material
Advancing a programme in automatic machines
Copying complicated profiles
Q.23
A big advantage of PERT over Gantt charts is that in the former case
Activities and events are clearly shown
Early start and late finish of an activity are clearly marked
Activity times are clear
Interrelationship among activities is clearly shown
Q.24
Performance rating is equal to
Observed performance + normal performance
Observed performance - normal performance
Observed performance × normal performance
None of the above
Q.25
In value engineering, important consideration is given to
Customer satisfaction
Function concept
Profit maximization
Cost reduction
Q.26
Which of the following conditions are necessary for applying linear programming?
These must be a well defined objective function.
The decision variables should be interrelated and nonnegative.
The resources must be in limited supply.
All of the above
Q.27
The term 'value' in value engineering refers to
Total cost of the product
Selling price of the product
Utility of the product
Manufactured cost of the product
Q.28
In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if
Complete details of items in, waiting line are known
Arrival and waiting times are known and can be grouped to form a waiting line model
All variables and constants are known and form a linear equation
The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known
Q.29
The main objective of work measurement is to
Plan and schedule of production
Formulate a proper incentive scheme
Estimate the selling prices and delivery dates
All of the above
Q.30
For a product layout the material handling equipment must
Have full flexibility
Employ conveyor belts, trucks, tractors etc.
Be a general purpose type
Be designed as special purpose for a particular application
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page