Q.1
Work sampling is applied for
Estimation of the percentage utilization of machine tools
Estimating the percentage of the time consumed by various job activities
Finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible
All of the above
Q.2
Which of the following equations is not in conformity with others?
Organization performance × motivation = profits
Knowledge × skill = ability
Ability × motivation = performance
Attitude × situation = motivation
Q.3
The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)
(to + tp + tn)/3
(to + 2tp + tn)/4
(to + 4tp + tn)/5
(to + tp + 4tn)/6
Q.4
The assumption in PERT is
A project will always be behind schedule, if left uncorrected
Cost of project will always be more than the estimated cost, if no timely corrections are taken
A project can be subdivided into a set of predictable, independent activities
Activities are fixed and can't be changed
Q.5
Bin card is used in
Administrative wing
Workshop
Foundry shop
Stores
Q.6
Acceptance sampling is used in
Job production
Batch production
Mass production
All of these
Q.7
The performance of a specific task in CPM is known as
Dummy
Event
Activity
Contract
Q.8
Line organization is suitable for
Sugar industries
Oil refining industries
Spinning and weaving industries
All of these
Q.9
Work sampling observations are taken on the basis of
Detailed calculations
Convenience
Table of random numbers
Past experience
Q.10
Break-even analysis consists of
Fixed cost
Variable cost
Fixed and variable costs
Operation costs
Q.11
PERT analysis is based on
Optimistic time
Pessimistic time
Most likely time
All of the above
Q.12
Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it
Consumes time, but no resources
Consumes resources but no time
Consumes neither time nor resources
Is a dangling event
Q.13
A CPM family includes
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
CPS (Critical Path Scheduling)
All of the above
Q.14
M.T.M. is used to
Improve existing methods
Establish time standards
Develop effective methods in advance of the beginning of production
All of the above
Q.15
In a line organization
Responsibility of each individual is fixed
Discipline is strong
Quick decisions are taken
All of these
Q.16
The value engineering technique in which experts of the same rank assemble for product development is called
Delphi
Brain storming
Morphological analysis
Direct expert comparison
Q.17
What does symbol 'V' employ in work study
Operation
Inspection
Delay/ temporary Storage
Permanent storage
Q.18
What does symbol 'D' imply in work study?
Inspection
Transport
Delay/temporary storage
Permanent storage
Q.19
What does symbol 'O' imply in work study?
Operation
Inspection
Transport
Delay/temporary storage
Q.20
The salient feature of functional organisation is
Strict adherence to specification
Separation of planning and design part
Each individual maintains functional efficiency
All of the above
Q.21
The time which results in the least possible direct cost of an activity is known as
Normal time
Slow time
Crash time
Standard time
Q.22
The grouping of activities into organizational units is called
Corporate plans
Higher level management
Functional authority
Departmentation
Q.23
If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good
EF = ES + D
LS = LFD
LF = LS + D
All of the above
Q.24
When slack of an activity is negative
It represents a situation where extra resources are available and the completion of project is not delayed
It represents that a programme falls behind schedule and additional resources are required to complete the project in time
The activity is critical and any delay in its performance will delay the completion of whole project
All of the above
Q.25
When slack of an activity is positive
It represents a situation where extra resources are available and the completion of project is not delayed
It represents that a programme falls behind schedule and additional resources are required to complete the project in time
The activity is critical and any delay in its performance will delay the completion of whole project
Any one of the above
Q.26
The two bin system is concerned with
Ordering procedure
Forecasting sales
Production planning
Despatching and expediting
Q.27
Work study is concerned with
Improving present method and finding standard time
Motivation of workers
Improving production capability
Improving production planning and control
Q.28
The artificial activity, which indicates that an activity following it cannot be started unless, the preceding activity is complete, is known as
Event
Free float
Artificial
Dummy
Q.29
In time study, the rating factor is applied to determine
Standard time of a job
Merit rating of the worker
Fixation of incentive rate
Normal time of a worker
Q.30
If TL is the largest allowable event occurrence time, total activity slack (s) is equal to
Latest start time earliest start time
Latest finish time earliest finish time (EFT)
TLEFT
All of the above
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page