Q.1
Tick the odd man out
Q.2
Activity slack or float of any event on a PERT/CPM chart is represented by
Q.3
Acceptance sampling is widely used in
Q.4
Dummy activities are used to
Q.5
Scheduling gives information about
Q.6
In PERT analysis, critical path is obtained by joining events having
Q.7
CPM has following time estimate
Q.8
PERT has following time estimate
Q.9
The routing function in a production system design is concerned with
Q.10
In process layout
Q.11
In product layout
Q.12
A low unit cost can be obtained by following
Q.13
Gantt chart gives information about
Q.14
Gantt charts provide information about
Q.15
The critical activity has
Q.16
In order that linear programming techniques provide valid results
Q.17
Standard time is defined as
Q.18
In a PERT chart
Q.19
Slack of various events on the critical path in PERT/CPM chart
Q.20
Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is _________ the standard time.
Q.21
Critical Path Net Work helps an engineer
Q.22
Queueing theory is used for
Q.23
Percent idle time for men or machines is found by
Q.24
A critical activity has
Q.25
The basic difference between PERT and CPM is that
Q.26
Value engineering aims at finding out the
Q.27
Process layout is employed for
Q.28
Product layout is employed for
Q.29
Bar chart is suitable for
Q.30
Break-even analysis shows profit when