Q.1
PERT analysis is based upon
Optimistic time
Pessimistic time
Most likely time
All of these
Q.2
Pessimistic time is
The maximum time which an activity might require
The average time required for a job
The most probable time considering all conditions
The minimum time in which an activity can possibly be accomplished
Q.3
The appellate authority for an industrial dispute is
Management
Labour court
High court/supreme court
Board of directors
Q.4
Choose the wrong statement. Motion study is used for
Improving a work method
Improvising a work method
Designing a work method
Reducing inventory costs
Q.5
In Halsey 50-50 plan, output standards are established
By time study
From previous production records
From one's judgment
All of the above
Q.6
Queuing theory is associated with
Sales
Inspection time
Waiting time
Production time
Q.7
Break-even analysis can be used for
Short run analysis
Long run analysis
Average of above two run analysis
There is no such criterion
Q.8
Work study is mainly aimed at
Determining the most efficient method of performing a job
Establishing the minimum time of completion of a job
Developing the standard method and standard time of a job
Economizing the motions involved on the part of the worker while performing a job
Q.9
A company spends considerable amount on publicity to promote sales. This expenditure in break even chart is shown below the
Fixed cost line
Variable cost line
Total cost line
Sales revenue line
Q.10
Pick up the correct statement from the following
Critical path method is an improvement upon bar chart method
Critical path method provides a realistic approach to the daily problems
Critical path method avoids delays which are very common in bar chart
All of the above
Q.11
Pick up the incorrect statement from the following
An activity of the project is denoted by an arrow on the net work
The tail of the arrow indicates the start of the activity
The head of the arrow indicates the end of the activity
The arrows are drawn (to scale from) left to right
Q.12
Routing
Prescribes the sequence of operations to be followed
Determines the programme for the operations
Is concerned with starting of processes
Regulates the progress of job through various processes
Q.13
PERT is applied for
Marketing programmes and advertising programmes
Installation of machinery
Research and development of products
All of these
Q.14
Discrepancies of bar chart techniques are
Consequential effects of lack in one activity on the finish date
Free time available for an activity can't be predicted
Effective monitoring/controlling can't be done
All of the above
Q.15
In steel plant the most important system for materials handling is
Conveyors
Cranes and hoists
Trucks
Locos
Q.16
Work study involves
Only method study
Only work measurement
Method study and work measurement
Only motion study
Q.17
Gantt chart provides information about the
Material handling
Proper utilization of manpower
Production schedule
Efficient working of machine
Q.18
Pick up the correct statement from the following
If the float is positive and the activity is delayed by a period equal to its total float, the completion of project in not delayed
If the float of an activity is negative, delay in its performance is bound to delay the completion of project
If the float of an activity is zero, the activity is critical and any delay in its performance will delay the whole project
All of the above
Q.19
Pick up the correct statement from the following
Programmer evaluation and review technique is event oriented
Programmer evaluation and review technique is not event oriented
Critical path method is event oriented
None of the above
Q.20
In crash program for a project
both direct and indirect costs, increase
indirect costs increase and direct costs decrease
direct costs increase and indirect costs decrease
cost is no criterion
Q.21
Graphical method, simplex method, and transportation method are concerned with
Break-even analysis
Value analysis
Linear programming
Queueing theory
Q.22
Emergency rush order can be pushed more effectively in
Job production
Automatic production
Continuous production
Intermittent production
Q.23
TMU in method time measurement stands for
Time motion unit
Time measurement unit
Time movement unit
Technique measurement unit
Q.24
Slack represents the difference between the
Latest allowable time and the normal expected time
Latest allowable time and the earliest expected time
Proposed allowable time and the earliest expected time
Normal allowable time and the latest expected time
Q.25
Job enrichment technique is applied to
Reduce labour monotony
Overcome boring and demotivating work
Make people happy
All of the above
Q.26
A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called
Hoist
Jib crane
Portable elevator
Chain conveyor
Q.27
In inventory control, the economic order quantity is the
Optimum lot size
Highest level of inventory
Lot corresponding to break-even point
Capability of a plant to produce
Q.28
Positive slack on a PERT indicates that project is
Ahead of schedule
Beyond schedule
As per schedule
On critical path
Q.29
Break-even point is the point where
Fixed and variable cost lines intersect
Fixed and total cost lines intersect
Variable and total cost lines intersect
Sales revenue and total expensive lines intersect
Q.30
If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be
TR
TR + [(S - T)/2] × R
TR + (S - T) × R
TR + [(S - T)/S] × R
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page