Q.1
Military type of organisation is known as
  • line organisation
  • functional organisation
  • line and staff organisation
  • line, staff and functional organisation
Q.2
The simplex method is the basic method for
  • Value analysis
  • Operation research
  • Linear programming
  • Model analysis
Q.3
According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum)
  • CAM < DAM
  • CAM > DAM
  • CAM = DAM
  • There is no such criterion
Q.4
The essential condition for the decompression of an activity is that
  • The project time should change due to decompression
  • After decompression the time of an activity invariably exceeds its normal time
  • An activity could be decompressed to the maximum extent of its normal time
  • None of the above
Q.5
PERT
  • provides an approach for keeping planning up-to-date
  • provides a way for management to require that planning be done on a uniform and logical basis
  • permits management to foresee quickly the impact of variations from the plan
  • all of the above
Q.6
Which one of the following techniques is used for determining allowances in time study?
  • Acceptance sampling
  • Linear regression
  • Performance rating
  • Work sampling
Q.7
Process layout is employed
  • where low volume of production is required
  • where similar jobs are manufactured on similar machines
  • where machines are arranged on functional basis
  • all of the above
Q.8
The value engineering technique in which experts of the same rank assemble for product development is called
  • Delphi
  • brain storming
  • morphological analysis
  • direct expert comparison
Q.9
Travel charts are used to
  • analyse material handling
  • determine inventory control difficulties
  • plan material handling procedure and routes
  • all of the above
Q.10
The interchangeability can be achieved by
  • standardisation
  • better process planning
  • bonus plan
  • better product planning
Q.11
Actual performance of a task is called
  • an event
  • an activity
  • a duration
  • none of these
Q.12
Which of the following wage incentive plan is applied to all workers?
  • Halsey plan
  • Gantt plan
  • Emerson's efficiency plan
  • Rowan plan
Q.13
Halsey plan of wage incentive
  • is not applied to all level of workers
  • is applied to all level of workers
  • does not guarantee minimum wage
  • is based upon efficiency of worker
Q.14
CPM requires
  • single time estimate
  • double time estimate
  • triple time estimate
  • none of these
Q.15
PERT is a project planning and control technique.
  • Yes
  • No
Q.16
The most suitableincentive plan for the maintenance section of an industry will be
  • piece rate system
  • group incentive plan
  • profit sharing plans
  • simplification
Q.17
Process layout is also known as
  • analyticallayout
  • synthetic layout
  • static product layout
  • none of these
Q.18
For handling materials during manufacture of cement, a __________ is widely used.
  • belt conveyor
  • bucket conveyor
  • fork lift truck
  • overhead crane
Q.19
Linear programming can be applied successfully to
  • chemical industry
  • oil industry
  • banks
  • all of these
Q.20
The product layout is more amenable to automation than process layout.
  • True
  • False