Q.1
PERT requires
single time estimate
double time estimate
triple time estimate
none of these
Q.2
Queuing theory is associated with
inventory
sales
waiting time
production time
Q.3
Representative time is the average of times recorded by work study man for an operation.
Agree
Disagree
Q.4
Which of the following type of layout is suitable for automobile manufacturing concern?
product layout
process layout
fixed position layout
combination layout
Q.5
String diagram is used
for checking the relative values of various layouts
when a group of workers are working at a place
where processes require the operator to be moved from one work place to another
all of the above
Q.6
Direct expenses include
factory expenses
selling expenses
administrative expenses
none of these
Q.7
In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used.
Yes
No
Q.8
The routing function in a production system design is concerned with
manpower utilisation
quality assurance of the product
machine utilisation
optimising material flow through the plant
Q.9
Job evaluation is the method of determining the
relative values of a job
worker's performance on a job
worth of the machine
value of overall production
Q.10
Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
Halsey plan
Gantt plan
Rowan plan
Emerson's efficiency plan
Q.11
Simplex method is the method used for
value analysis
network analysis
linear programming
queuing theory
Q.12
Dispatching
prescribes the sequence of operations to be followed
determines the programme for the operations
is concerned with the starting of processes
regulates the progress of job through various processes
Q.13
In A-B-C analysis, which class of items are generally large in number?
A
B
C
none of these
Q.14
In order to avoid excessive multiplication of facilities, the layout preferred is
product layout
process layout
group layout
static layout
Q.15
A-B-C analysis is used in
CPM
PERT
inventory control
all of these
Q.16
Work study involues
only method study
only work measurement
method study and work measurement
only motion study
Q.17
Which of the following are the guidelines for the construction of a network diagram?
Each activity is represented by one and only one arrow in the network.
Dangling must be avoided in a network diagram.
Dummy activity consumes no time or resource.
all of the above
Q.18
In a line organisation
responsibility of each individual is fixed
discipline is strong
quick decisions are taken
all of these
Q.19
The determination of standard time in a complex job system is best done through
stop watch time study
analysis of micromotions
grouping timing technique
analysis of standard data system
Q.20
A diagram showing the path followed by men and materials while performing a task is known as
string diagram
flow process chart
travel chart
flow diagram
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page