Q.1
A Production Rig is a type of rig that is used on a producing wellhead platform.
a) True
b) False
Q.2
Which of the following is correct regarding the Bell nipple?
a) It is a section of large diameter pipe fitted to the top of the BOP
b) Used inside packer
c) Used inside side pocket mandrel
d) Set inside liner
Q.3
Which of the following is correct regarding the Crown block?
a) It is a section of large diameter pipe fitted to the top of the BOP
b) Used inside packer
c) It is the stationary end of the block and tackle
d) Set inside liner
Q.4
Which of the following is correct regarding the Drill line?
a) It is thick, stranded metal cable threaded through the two blocks
b) Used inside packer
c) It is the stationary end of the block and tackle
d) Set inside liner
Q.5
Which of the following is correct regarding the Swivel?
a) It is thick, stranded metal cable threaded through the two blocks
b) It is the top end of the kelly that allows the rotation of the drill string
c) It is the stationary end of the block and tackle
d) Set inside liner
0 h : 0 m : 1 s
1
2
3
4
5
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page