MCQGeeks
0 : 0 : 1
CBSE
JEE
NTSE
NEET
English
UK Quiz
Quiz
Driving Test
Practice
Games
Quiz
Petroleum Production Operations
Petroleum Production Operations Written Test
Quiz 1
1
2
3
4
5
6
7
8
Q.1
Productivity or Deliverability Tests can be applied to Non- Darcy, below the bubble point flow conditions.
a) True
b) False
Q.2
What is the formula of the Productivity Index?
a) q/(Pi-Pwf)
b) (Pi-Pwf)/q
c) V/(Pi-Pwf)
d) q/(Pi.Pwf)
Q.3
What is Absolute Open Flow Potential?
a) The production rate if the bottom hole flowing pressure can be reduced to zero
b) The production rate if the bottom hole shut-in pressure can be reduced to zero
c) The production rate if the bottom hole flowing pressure can be reduced to 1 atm
d) The production rate if the bottom hole shut-in pressure can be reduced to 1 atm
Q.4
Specific Productivity index is _____
a) q/(Pi-Pwf)
b) Productivity Index/Fluid density
c) (Pi-Pwf)/q
d) Productivity Index/Length of the producing zone
Q.5
If a well is producing above bubble point pressure then the Productivity Index will be constant for a wide range of drawdowns.
a) True
b) False
Q.6
Which well is having the highest draw-down?
a) Well A
b) Well B
c) Well C
d) Well A and C
Q.7
Inflow after flow deliverability curve, which of the plot we generally use?
a) Pwf vs t
b) Pi vs t
c) (Pi2 – Pwf2) vs q
d) (Pi2 – Pwf2) vs t
Q.8
What is the full form of Mcfd?
a) Millions of standard cubic feet per day
b) Thousands of standard cubic feet per day
c) Hundreds of standard cubic feet per day
d) Standard cubic feet per day
0 h : 0 m : 1 s
1
2
3
4
5
6
7
8
Report Question
×
What's an issue?
Question is wrong
Answer is wrong
Other Reason
Want to elaborate a bit more? (optional)
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page